References

Since its establishment, Gramper focused its business on a cooperation with Elektroprivreda Srbije and all its production, transmission and distribution systems.

The largest portion of equipment deliveries has been accomplished with EPS distributions and former distribution centers: Elektrosrbija – Kraljevo, Centar – Kragujevac, Elektrovojvodina – Novi Sad, Jugoistok -Niš, Elektrodistribucija Belgrade.

We have participated in the delivery of the following equipment in recent years:

  • Substations 110/35/20/10/0.4kv
  • Cable lines 110/35/20/10kv
  • Overhead lines 110/35/20/10kv
  • External electric grids of full housing facilities
  • Street reconstruction
  • Bridge reconstruction
  • Cultural monuments reconstruction
  • Hotel construction
  • Tunnel construction
  • Highway construction
  • MTC construction
  • Control and measurement laboratories
  • Wind parks
  • Relocation of measuring points
  • Solar power plants
  • Mini hydroelectric power plants

Significant facilities for which we participated in equipment delivery

2020.

Copper mine Construction project PRP 110kV Čukaru peki – Bor

2020.

Belgrade Waterfront – Belgrade

2020.

Linglong – Zrenjanin

2020.

Bypass around Belgrade Ostružnica – Bubanj potok

2020.

Highway E763 Surčin – Obrenovac

2020.

Power plant design with combined power cycle 160MW – Pančevo

2019.

Tunnel Bancarevo

2019.

Tunnel Sarlah

2019.

Belgrade Train Station

2019.

Wind Park Čibuk

2019.

Wind Park Vršac– Košava 1

2018.

Brankov bridge

2018.

National Theatre

2018.

Wind Park Alibunar

2017.

Corridor 11

2017.

Lidl Serbia

2017.

Hotel Hilton

2017.

Wind Park Malibunar

2016.

Ikea Serbia

2016.

National Museum

2015.

Belgrade Waterfront

2014.

Bridge Zemun – Borča

2013.

Hotel Radisson blue

2011.

Gazela bridge

2011.

Ada bridge

2009.

Avala Tower

© Gramper 2021.